WATER BALANCE PILOT
AT THE SCHOOL FOR THE DEAF AND THE BLIND,
LITTLE FLOWER CONVENT, CHENNAI.

a project by
Chennai's first collaborative water alliance

SKIP INTRO
stopicon
Project team
Support & Facilitation
REMOTE MONITORING SETUP
0 KLD
(Kilo Liters per day)
179 ppl.
arrow arrow-anim topicon topicon topicon arrow arrow-anim arrow arrow-anim arrow arrow-anim arrow arrow-anim arrow arrow-anim arrow arrow-anim
OVERFLOW TO MUNICIPAL SEWER
SETTLER
PRE-TREATMENT ANAEROBIC
arrow arrow-anim
flowmeter-img-1
FLOWMETER
flowmeterhead
TOT:
0
FLOW:
0.0000

ANAEROBIC REACTOR
PRIMARY TREATMENT ANAEROBIC
arrow arrow-anim
     
CONSTRUCTED WETLAND - 1
     
CONSTRUCTED WETLAND - 2
SECONDARY TREATMENT AEROBIC
arrow arrow-anim
WATER TANK
arrow arrow-anim
flowmeter-img-2
FLOWMETER
flowmeterhead
TOT:
0
FLOW:
0.0000

flowmeterhead
BGL:
0
BELOW GROUND LEVEL

SENSOR
0 l/day
(data updated every 24 hours)
Reduced waste water volume to city sewer
Treated water used for irrigation
Reduced fresh water consumption
Added to local aquifer
3000 plants
treat waste water irrigated using treated water 900 m2 garden within 1800 m2 overall footprint.
2°C cooling
in micro climate produced by plants and trees
100% solar powered
electricity used for pumps.
RECHARGE WELL
BORE WELL
MONITORING WELL
IRRIGATION & INFILTRATION GARDENS
cloud sample
layer arrow arrow-anim
MONITORING QUANTITY  LIVE
QUANTITY OF TREATMENT
(Data updates in every 24 hours)
SETTLER
PRE-TREATMENT ANAEROBIC
arrow arrow-anim
flowmeter-img-1
FLOWMETER

ANAEROBIC REACTOR
PRIMARY TREATMENT ANAEROBIC
arrow arrow-anim
     
CONSTRUCTED WETLAND - 1
     
CONSTRUCTED WETLAND - 2
SECONDARY TREATMENT AEROBIC
arrow arrow-anim
WATER TANK
arrow arrow-anim
flowmeter-img-2
FLOWMETER

IMPACT ON GROUND WATER LEVEL
flowmeterhead
BGL:
0
BELOW GROUND LEVEL

SENSOR
BORE WELL
MONITORING WELL
IRRIGATION & INFILTRATION GARDENS
GROUND LEVEL
-100  cm

-200  cm

-300  cm

-400  cm

-500  cm

-600  cm

-700  cm

-800  cm

-900  cm

-1000  cm

-1100  cm

-1200  cm

-1300  cm

-1400  cm


BELOW GROUND LEVEL
layer arrow arrow-anim
MONITORING QUALITY : THROUGH SSFCW - 1

24 hour samples collected with
composite sampler
& tested in certified lab.
arrow arrow-anim
SETTLER
PRE-TREATMENT ANAEROBIC
arrow arrow-anim
flowmeter-img-1
FLOWMETER
ANAEROBIC REACTOR
SECONDARY TREATMENT ANAEROBIC
arrow arrow-anim
     
CONSTRUCTED WETLAND - 1
     
CONSTRUCTED WETLAND - 2
TERTIARY TREATMENT AEROBIC
arrow arrow-anim
WATER TANK
arrow arrow-anim
flowmeter-img-2
FLOWMETER
Settler Anaerobic Reactor Constructed Wetland1
pH
BOD
COD
TSS
TDS
Sample Data Collected on : 0000-00-00
Borewell
pH
BOD
COD
TSS
TDS
RECHARGE WELL
BORE WELL
IRRIGATION & INFILTRATION GARDENS
cloud sample
layer arrow arrow-anim